RIS citation export for THXGBF2: Beam Commissioning of the IFMIF EVEDA Very High Power RFQ

TY - CONF
AU - Fagotti, E.
AU - Antoniazzi, L.
AU - Bellan, L.
AU - Bolzon, B.
AU - Bortolato, D.
AU - Cara, P.
AU - Chauvin, N.
AU - Comunian, M.
AU - Dzitko, H.
AU - Ebisawa, T.
AU - Facco, A.
AU - Gex, D.
AU - Giacchini, M.G.
AU - Gobin, R.
AU - Grespan, F.
AU - Heidinger, R.
AU - Jokinen, A.
AU - Kasugai, A.
AU - Kondo, K.
AU - Marqueta, A.
AU - Mereu, P.
AU - Montis, M.
AU - Moya, I.
AU - Palmieri, A.
AU - Phillips, G.
AU - Pisent, A.
AU - Pruneri, G.
AU - Sakamoto, K.
AU - Scantamburlo, F.
AU - Shinya, T.
AU - Sugimoto, M.
AU - Weber, M.
ED - Koscielniak, Shane
ED - Satogata, Todd
ED - Schaa, Volker RW
ED - Thomson, Jana
TI - Beam Commissioning of the IFMIF EVEDA Very High Power RFQ
J2 - Proc. of IPAC2018, Vancouver, BC, Canada, April 29-May 4, 2018
C1 - Vancouver, BC, Canada
T2 - International Particle Accelerator Conference
T3 - 9
LA - english
AB - IFMIF, the International Fusion Materials Irradiation Facility, is an accelerator-based neutron source that will use Li(d, xn) reactions to generate a flux of neutrons with a broad peak at 14 MeV equivalent to the conditions of the Deuterium-Tritium reactions in a fusion power plant. IFMIF is conceived for fusion materials testing. The IFMIF prototype linear accelerator (LIPAc) is jointly developed by Europe and Japan within the IFMIF EVEDA project: it is composed of an ion source, a LEBT, an RFQ, a MEBT and a SC linac, with a final energy of 9 MeV. The 4-vane Radio Frequency Quadrupole (RFQ), developed by INFN in Italy, will accelerate a 130 mA deuteron beam from 0.1 to 5 MeV in continuous wave, for a beam power of 650 kW. The 9.8 m long 175 MHz cavity is composed of 18 x 0.54 m long modules flanged together and aligned within 0.3 mm tolerance. The RFQ was completed, delivered and assembled at the Rokkasho site and is presently under extended RF tests. The second phase of beam commissioning (up to 2.5 MeV/u) was scheduled to start at the end of 2017. Several unexpected issues and incidents significantly delayed the original program, which is however proceeding step by step toward the full achievement of its goals.
PB - JACoW Publishing
CP - Geneva, Switzerland
SP - 2902
EP - 2907
KW - rfq
KW - cavity
KW - MMI
KW - vacuum
KW - operation
DA - 2018/06
PY - 2018
SN - 978-3-95450-184-7
DO - 10.18429/JACoW-IPAC2018-THXGBF2
UR - http://jacow.org/ipac2018/papers/thxgbf2.pdf
ER -