JACoW logo

Joint Accelerator Conferences Website

The Joint Accelerator Conferences Website (JACoW) is an international collaboration that publishes the proceedings of accelerator conferences held around the world.


RIS citation export for THXGBD3: Status of the ESRF-Extremely Brilliant Source Project

TY - CONF
AU - Revol, J.-L.
AU - Benabderrahmane, C.
AU - Berkvens, P.
AU - Biasci, J.C.
AU - Bouteille, J-F. B.
AU - Brochard, T.
AU - Carmignani, N.
AU - Chaize, J.M.
AU - Chavanne, J.
AU - Cianciosi, F.
AU - D'Elia, A.
AU - Dimper, R.D.
AU - Dubrulle, M.
AU - Einfeld, D.
AU - Ewald, F.
AU - Eybert, L.
AU - Gautier, G.
AU - Goirand, L.
AU - Hardy, L.
AU - Jacob, J.
AU - Joly, B.
AU - Langlois, M.L.
AU - Le Bec, G.
AU - Leconte, I.
AU - Liuzzo, S.M.
AU - Maccarrone, C.
AU - Mairs, T.R.
AU - Marchial, T.
AU - Marques, H.P.
AU - Martin, D.
AU - Mercier, J.M.
AU - Meunier, A.
AU - Morati, M.
AU - Pasquaud, J.
AU - Perron, T.P.
AU - Plouviez, E.
AU - Rabeuf, E.
AU - Raimondi, P.
AU - Renaud, P.
AU - Roche, B.
AU - Scheidt, K.B.
AU - Serrière, V.
AU - Van Vaerenbergh, P.
AU - Versteegen, R.
AU - White, S.M.
ED - Koscielniak, Shane
ED - Satogata, Todd
ED - Schaa, Volker RW
ED - Thomson, Jana
TI - Status of the ESRF-Extremely Brilliant Source Project
J2 - Proc. of IPAC2018, Vancouver, BC, Canada, April 29-May 4, 2018
C1 - Vancouver, BC, Canada
T2 - International Particle Accelerator Conference
T3 - 9
LA - english
AB - The ESRF - the European Synchrotron Radiation Facility - is a user facility in Grenoble, France, and the source of intense high-energy (6 GeV) X-rays. In 2019, the existing storage ring will be removed and a new lattice will be installed in its place, dramatically reducing the equilibrium horizontal emittance. This 'fourth-generation' synchrotron will produce an X-ray beam 100 times more brilliant and coherent than the ESRF source today. The Extremely Brilliant Source (EBS) project was launched in 2015 and is now well underway, on track for its scheduled completion in 2020. The design is completed, the procurement in full swing, the assembly has started, and critical installation activities are being prepared. The current status, three years into the project, will be revealed, along with the expected performance of the accelerator and the technical challenges involved. This paper will focus on the implementation of the project.
PB - JACoW Publishing
CP - Geneva, Switzerland
SP - 2882
EP - 2885
KW - SRF
KW - vacuum
KW - operation
KW - injection
KW - dipole
DA - 2018/06
PY - 2018
SN - 978-3-95450-184-7
DO - 10.18429/JACoW-IPAC2018-THXGBD3
UR - http://jacow.org/ipac2018/papers/thxgbd3.pdf
ER -