| DOI | Title |
|---|---|
| doi:10.18429/JACoW-IPAC2016-WEPMW009 | Towards a Mono-chromatization Scheme for Direct Higgs Production at FCC-ee |
| doi:10.18429/JACoW-IPAC2016-MOPMB008 | Modeling and Experimental Studies of Beam Halo at ATF2 |
| doi:10.18429/JACoW-IPAC2016-WEPOR016 | Pre-alignment of Accelerating Structures for Compact Acceleration and High Gradient using In-situ Radiofrequency Methods |
| doi:10.18429/JACoW-IPAC2016-MOPMB008 | Modeling and Experimental Studies of Beam Halo at ATF2 |
| doi:10.18429/JACoW-IPAC2016-MOPMR019 | Beam Tests of a Prototype Stripline Beam Position Monitoring System for the Drive Beam of the CLIC Two-beam Module at CTF3 |
| doi:10.18429/JACoW-IPAC2016-WEPMW009 | Towards a Mono-chromatization Scheme for Direct Higgs Production at FCC-ee |
| doi:10.18429/JACoW-IPAC2016-WEPOR016 | Pre-alignment of Accelerating Structures for Compact Acceleration and High Gradient using In-situ Radiofrequency Methods |
| doi:10.18429/JACoW-IPAC2016-THPOR030 | Commissioning and First Performance Studies of a Single Vertical Beam Halo Collimation System at ATF2 |
| doi:10.18429/JACoW-IPAC2016-THPOR031 | Beam-Loading Effect on Breakdown Rate in High-Gradient Accelerating Structures |