Elettra-Sincrotrone Trieste S.C.p.A.
Basovizza, Italy
DOI Title
doi:10.18429/JACoW-IPAC2016-TUOAB02 Conditions for CSR Microbunching Gain Suppression
doi:10.18429/JACoW-IPAC2016-MOPMW006 The RF System of the ELI-NP Gamma Beam Source
doi:10.18429/JACoW-IPAC2016-MOPOW005 First Electron Beam Measurements on COXINEL
doi:10.18429/JACoW-IPAC2016-MOPOW015 Fermi Upgrade Plans
doi:10.18429/JACoW-IPAC2016-TUOAB02 Conditions for CSR Microbunching Gain Suppression
doi:10.18429/JACoW-IPAC2016-TUPMY041 Delivery Status of the ELI-NP Gamma Beam System
doi:10.18429/JACoW-IPAC2016-TUPOW004 Status of the STAR Project
doi:10.18429/JACoW-IPAC2016-WEPMB008 ESS DTL Mechanical Design and Prototyping.
doi:10.18429/JACoW-IPAC2016-WEPMY042 Effective Cycling and Ramping
doi:10.18429/JACoW-IPAC2016-WEPOW018 Elettra Status and Upgrades