| DOI | Title |
|---|---|
| doi:10.18429/JACoW-IPAC2016-TUOAB02 | Conditions for CSR Microbunching Gain Suppression |
| doi:10.18429/JACoW-IPAC2016-MOPMW006 | The RF System of the ELI-NP Gamma Beam Source |
| doi:10.18429/JACoW-IPAC2016-MOPOW005 | First Electron Beam Measurements on COXINEL |
| doi:10.18429/JACoW-IPAC2016-MOPOW015 | Fermi Upgrade Plans |
| doi:10.18429/JACoW-IPAC2016-TUOAB02 | Conditions for CSR Microbunching Gain Suppression |
| doi:10.18429/JACoW-IPAC2016-TUPMY041 | Delivery Status of the ELI-NP Gamma Beam System |
| doi:10.18429/JACoW-IPAC2016-TUPOW004 | Status of the STAR Project |
| doi:10.18429/JACoW-IPAC2016-WEPMB008 | ESS DTL Mechanical Design and Prototyping. |
| doi:10.18429/JACoW-IPAC2016-WEPMY042 | Effective Cycling and Ramping |
| doi:10.18429/JACoW-IPAC2016-WEPOW018 | Elettra Status and Upgrades |