| MOZB01 |
Construction and Beam Commissioning of CSNS Accelerators |
47 |
| |
- S. Wang, S. Fu, J. Zhang
IHEP, Beijing, People's Republic of China
|
|
| |
CSNS (China Spallation Neutron Source) is a proton accelerator based facility for delivering spallation neu-trons to users. The main components are 80-MeV linac, 1.6-GeV RCS and neutron production target. The con-struction began in 2011, and now construction of the building and accelerator components is well in progress. Most of the components have been tested and installed into the tunnel. The ion source and RFQ have been suc-cessfully commissioned. The first DTL tank has success-fully completed the beam commissioning, and the beam commissioning for the other three DTL tank will be per-formed before the end of 2016. The RCS commissioning will start in the beginning of 2017. This presentation provides a complete overview of the status of construc-tion and beam commissioning.
|
|
|
Slides MOZB01 [11.853 MB]
|
|
| Export • |
reference for this paper to
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
| |
| TUPMR004 |
Simulations of High Current NuMI Magnetic Horn Striplines at FNAL |
1230 |
| |
- T. Sipahi, S. Biedron, S.V. Milton
CSU, Fort Collins, Colorado, USA
- J. Hylen, R.M. Zwaska
Fermilab, Batavia, Illinois, USA
|
|
| |
Both the NuMI (Neutrinos and the Main Injector) beam line, that has been providing intense neutrino beams for several Fermilab experiments (MINOS, MINERVA, NOVA), and the newly proposed LBNF (Long Baseline Neutrino Facility) beam line which plans to produce the highest power neutrino beam in the world for DUNE (the Deep Underground Neutrino Experiment) need pulsed magnetic horns to focus the mesons which decay to produce the neutrinos. The high-current horn and stripline design has been evolving as NuMI reconfigures for higher beam power and to meet the needs of the LBNF design. The CSU particle accelerator group has aided the neutrino physics experiments at Fermilab by producing EM simulations of magnetic horns and the required high-current striplines. In this paper, we present calculations, using the Poisson and ANSYS Maxwell 3D codes, of the EM interaction of the stripline plates of the NuMI horns at critical stress points. In addition, we give the electrical simulation results using the ANSYS Electric code. These results are being used to support the development of evolving horn stripline designs to handle increased electrical current and higher beam power for NuMI upgrades and for LBNF
|
|