Paper | Title | Page |
---|---|---|
TUPOW036 | Recent Developments and Operational Status of the Compact ERL at KEK | 1835 |
|
||
The Compact Energy Recovery Linac (cERL) at KEK is a test accelerator in order to develop key components to realize remarkable ERL performance as a future light source. After the beam commissioning in December 2013, the legal current limit has been increased step-by-step like 1 uA, 10 uA, and 100 uA. Survey for the source of beam losses has been conducted in each step, and the study on beam dynamics and tuning has also been carried out. As a next step, 1 mA operation is scheduled in February 2016. In parallel to the increase in beam current, a laser Compton scattering (LCS) system which can provide high-flux X-ray to a beamline has been successfully commissioned. We report recent progress in various kinds of beam tuning: improvement of electron gun performance, high bunch charge operation, mitigation of beam losses, LCS optics tuning and bunch compression for THz radiation. | ||
Export • | reference for this paper to ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
TUPOW038 | Measurement and Control of Beam Losses Under High Average-current Operation of the Compact ERL at KEK | 1839 |
|
||
The compact ERL (cERL)* is a superconducting accelerator aimed at demonstrating excellent ERL technologies for the future light source. The cERL comprises a 5 MeV injector, a main linac, and a recirculation loop. In the cERL, production and transportation of low-emittance and high average-current beams (tentative goals: 1 mm-mrad and 10 mA) is primarily important. At this moment (in December 2015), beam currents of up to 80 uA (CW) have successfully been transported through the recirculation loop at a beam energy of 20 MeV. Before such high-current operations, we carefully tuned up the machine so that beam losses became very small. The beam losses were watched using fast beam-loss detectors and radiation monitors while absolute losses were estimated from measured radiation levels on the roof of the shield. After careful beam-optics corrections and elimination of beam halos / tails at low-energy section, we achieved the beam losses of at most a few nA level at several locations along the loop, and those below 1 nA elsewhere in the loop. We will report these results together with the result of higher-current operation which is planned early in 2016.
* S. Sakanaka et al., IPAC'15, TUBC1; T. Obina et al., to be presented at IPAC'16. |
||
Export • | reference for this paper to ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
WEPOW020 | Present Status of KEK Photon Factory and Future Project | 2871 |
|
||
Two synchrotron radiation sources of KEK, the PF-ring and the PF-AR, continue their user operation with various improvements. Scrap and build of the first generation undulators of 1980s at the PF-ring is pushed forward year by year. Five new elliptically polarized undulators have been installed in these five years, and we have also installed four very narrow-gap short-period undulators generating high brilliant X-ray. The new beam transport line that enables the 6.5-GeV full energy injection for PF-AR will be completed by the end of 2016 in order to make the top-up operation of the two SR sources compatible with the continuous injection for two main rings of the Super-KEKB. We have proposed a project of further upgrade of the 2.5-GeV PF-ring to improve its horizontal emittance as 8 nm rad using combined bending magnets at the arc sections. And we are also moving ahead on proposal of constructing a new KEK light source of an extremely low emittance as 0.3 nm rad. The progress and detail of our future project will be described in this paper. | ||
Export • | reference for this paper to ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |