Paper |
Title |
Page |
THPMW002 |
Power Supplies for Main Magnet of J-PARC Main Ring |
3534 |
|
- S. Nakamura, Y. Kurimoto, Y. Morita, T. Shimogawa
KEK, Ibaraki, Japan
|
|
|
A large magnetic field ripple of the order of 10-2 were observed at the first beam commissioning of J-PARC main ring in 2008, To eliminate the ripple, we had improved the magnet power supplies by reconstructing a trap-filter of 600 Hz and adopting an additional DCCT. We made differencial circuit and symmetrical wiring for all magnets. On the other hand, acceleration period was reduced from 2.5 s to 1.4 s for increasing the beam power with feedforward control. We summarize the improvements of the magnet power supplies in this paper.
|
|
Export • |
reference for this paper to
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|