Paper | Title | Page |
---|---|---|
WEPOR040 | LLRF Development for PAL-XFEL | 2761 |
|
||
PAL-XFEL construction is completed. Now, beam commissioning is ongoing after RF conditioning. The LLRF and SSA systems installed and in normal operation are presented. Those structures, features, characteristics, and performances are described. | ||
Export • | reference for this paper to ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |