Paper |
Title |
Page |
TUYA01 |
BEPCII Performance and Beam Dynamics Studies on Luminosity |
1014 |
|
- C.H. Yu, Z. Duan, S. Gu, Y.Y. Guo, X.Y. Huang, D. Ji, H.F. Ji, Y. Jiao, Zh.C. Liu, Y.M. Peng, Q. Qin, Y.S. Sun, S.K. Tian, J.Q. Wang, N. Wang, X.H. Wang, Y. Wei, X.M. Wen, J. Wu, J. Xing, G. Xu, Y. Yue, C. Zhang, Y. Zhang
IHEP, Beijing, People's Republic of China
|
|
|
The upgrade of the Beijing Electron Positron Collider, BEPCII, is now in a good performance for both high energy physics and synchrotron radiation experiments. The luminosity at the design energy of 1.89 GeV reached the design value 1.0*1033/cm2/s1 recently. A lot of work, including accelerator physics study and technical progress, has been done for the luminosity enhancement, not only at the design energy, but all the energy region run for HEP experiments from 1.0 to 2.3 GeV. The performance of BEPCII and the process of luminosity enhancement will be described in detail.
|
|
|
Slides TUYA01 [5.801 MB]
|
|
Export • |
reference for this paper to
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
WEOBA02 |
Commissioning of the China-ADS Injector-I Testing Facility |
2048 |
|
- F. Yan, J.S. Cao, Y.L. Chi, R. Ge, H. Geng, S. Gu, D.Z. Guo, T.M. Huang, X. Jing, H. Li, R.L. Liu, F. Long, C. Meng, H.F. Ouyang, W.M. Pan, Q.L. Peng, Y.F. Sui, J.L. Wang, S.C. Wang, Z. Xue, Q. Ye, Y.L. Zhao
IHEP, Beijing, People's Republic of China
|
|
|
The 10 MeV accelerator-driven subcritical system (ADS) Injector I test stand at Institute of High Energy Physics (IHEP) is a testing facility dedicated to demonstrate one of the two injector design schemes [Injector Scheme-I, which works at 325 MHz], for the ADS project in China. The ion source was installed since April of 2014, periods of commissioning are regularly scheduled between installation phases of the rest of the injector. 6.05 MeV proton energy has been achieved with average beam current of 10 mA by 7 SC spoke cavities at present. This contribution reports the details of the commissioning results together with the challenges of the CW machine commissioning.
|
|
|
Slides WEOBA02 [5.243 MB]
|
|
Export • |
reference for this paper to
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|