TUPMB046 |
The Preliminary Conceptual Design of a 2k Cryogneic System for Circular Electron Positron Collider (CEPC) |
1199 |
|
- Y.P. Liu, L. Bian, R. Ge, R. Han, S.P. Li, M.J. Sang, L.R. Sun, M.F. Xu, R. Ye, J.Q. Zhang, J.H. Zhang, X.Z. Zhang, Z.Z. Zhang
IHEP, Beijing, People's Republic of China
|
|
|
The Circular Electron Positron Collider (CEPC) is a long-term collider project, which will serve as a Higgs Factory and offer a unique opportunity for direct searches for New Physics in the high-energy range far beyond LHC reach [1]. In the frame of this project, a large 2K cryogenic system will be built to provide coolant for superconducting cavities used in booster ring and collider ring. All the superconducting cavities will be working under 2K. This paper will give a brief introduction to the preliminary considerations of this large cryogenic system, including the general layout, heat load estimation, helium refrigerator, schematic flow diagram as well as the main parameters and working process
|
|
Export • |
reference for this paper to
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
WEOBA02 |
Commissioning of the China-ADS Injector-I Testing Facility |
2048 |
|
- F. Yan, J.S. Cao, Y.L. Chi, R. Ge, H. Geng, S. Gu, D.Z. Guo, T.M. Huang, X. Jing, H. Li, R.L. Liu, F. Long, C. Meng, H.F. Ouyang, W.M. Pan, Q.L. Peng, Y.F. Sui, J.L. Wang, S.C. Wang, Z. Xue, Q. Ye, Y.L. Zhao
IHEP, Beijing, People's Republic of China
|
|
|
The 10 MeV accelerator-driven subcritical system (ADS) Injector I test stand at Institute of High Energy Physics (IHEP) is a testing facility dedicated to demonstrate one of the two injector design schemes [Injector Scheme-I, which works at 325 MHz], for the ADS project in China. The ion source was installed since April of 2014, periods of commissioning are regularly scheduled between installation phases of the rest of the injector. 6.05 MeV proton energy has been achieved with average beam current of 10 mA by 7 SC spoke cavities at present. This contribution reports the details of the commissioning results together with the challenges of the CW machine commissioning.
|
|
|