Paper | Title | Page |
---|---|---|
TUPMW034 | A 200 MHz SC-RF System for the HL-LHC | 1513 |
|
||
Funding: Research supported by the High Luminosity LHC project A quarter wave β=1 superconducting cavity at 200 MHz is proposed for the LHC as an alternative to the present 400 MHz RF system. The primary motivation of such a system would be to accelerate higher intensity and longer bunches with improved capture efficiency. Advantages related to minimizing electron cloud effects, intra-beam scattering, heating and the possibility of luminosity levelling with bunch length are described. Some considerations related to cavity optimization, beam loading and technological challenges are addressed. |
||
Export • | reference for this paper to ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
WEPMB058 | LHC Crab Cavity Coupler Test Boxes | 2248 |
|
||
The LHC double quarter wave (DQW) crab cavities have two different types of Higher Order Mode (HOM) couplers in addition to a fundamental power coupler (FPC). The FPC requires conditioning, so to achieve this we have designed a radio-frequency (RF) quarter wave resonator to provide high transmission between two opposing FPCs. For the HOM couplers we must ensure that the stop-band filter is positioned at the cavity frequency and that peak transmission occurs at the same frequencies as the strongest HOMs. We have designed two test boxes which preserve the cavity spectral response in order to test the couplers. | ||
Export • | reference for this paper to ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
WEPMR038 | Frequency Tuning for a DQW Crab Cavity | 2357 |
|
||
Funding: Work supported by US DOE via BSA LLC contract No.DE-AC02-98CH10886, the US LARP program, US DOE contract No. DE-AC02-05CH1123 (NERSC resources) and by HiLumi project. The nominal operating frequency for the HL-LHC crab cavities is 400.79 MHz within a bandwidth of ±60kHz. Attaining the required cavity tune implies a good understanding of all the processes that influence the cavity frequency from the moment when the cavity parts are being fabricated until the cavity is installed and under operation. Different tuning options will be available for the DQW crab cavity of LHC. This paper details the different steps in the cavity fabrication and preparation that may introduce a shift in the cavity frequency and introduces the different tuning methods foreseen to bring the cavity frequency to meet the specifications. |
||
Export • | reference for this paper to ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
THPOR024 | Electrical Power Budget for FCC-ee | 3828 |
|
||
Funding: Supported by the European Commission under the Capacities 7th Framework Programme project EuCARD-2, grant agreement 312453. We present a first rough estimate for the electrical power consumption of the FCC-ee lepton collider. This electrical power is dominated by the RF system, which provides the motivation for the ongoing R&D on highly efficient RF power sources. Other contributions come from the warm arc magnets, the cryogenics systems, cooling, ventilation, general services, the particle-physics detectors, and the injector complex. |
||
Export • | reference for this paper to ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |