Paper | Title | Page |
---|---|---|
THPMB001 | Muon Production via the ESSnuSB Project | 3213 |
|
||
Funding: This project is now supported by the COST Action CA15139 "Combining forces for a novel European facility for neutrino-antineutrino symmetry-violation discovery" (EuroNuNet). ESSnuSB plans to produce very intense neutrino beams using the protons from the ESS linac (5 MW, 2 GeV) and a 4-targets horn system. In the ESSnuSB proposed facility a copious number of muons will also be produced. These muons could be used by a future Neutrino Factory to study CP violation in the leptonic sector but also to study neutrino cross-sections. They could also be used to feed a future muon collider. The feasibility and the issues of extracting the intense muon beam produced together with neutrinos are discussed. |
||
Export • | reference for this paper to ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |