Paper |
Title |
Page |
WEPOW024 |
Commissioning of SESAME Booster |
2880 |
|
- M. Attal, I.A. Abid, T.H. Abu-Hanieh, H. Al-Mohammad, M.A. Al-Najdawi, D.S. Foudeh, A. Hamad, E. Huttel, A. Ismail, S.Kh. Jafar, F. Makahleh, M. Mansouri Sharifabad, K. Manukyan, I. Saleh, N.Kh. Sawai, M.M. Shehab
SESAME, Allan, Jordan
|
|
|
Commissioning of the 800 MeV booster of SESAME light source started in December 2013. The 38.4 m circumference booster is a part of SESAME injector which includes also a 20 MeV classical microtron as a pre-injector that is in operation since 2012. The main results and experience obtained during the commissioning period are reported in this paper.
|
|
Export • |
reference for this paper to
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
THPMR026 |
SESAME Storage Ring Beam Dynamics in View of the Results of its Magnet Measurements |
3446 |
|
- M. Attal, E. Huttel
SESAME, Allan, Jordan
|
|
|
SESAME storage ring magnets have been recently constructed and measured. The storage ring beam dynamics is reviewed in this article in view of these results. Moreover it is shown how the optical impact of dipoles main field errors is more mitigated by sorting dipoles in the storage ring in addition to the alignment optimization method suggested by magnetic measurement outcome.
|
|
Export • |
reference for this paper to
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|