Paper | Title | Page |
---|---|---|
TUBPR05 | LEReC Timing Synchronization with RHIC Beam | 746 |
|
||
Funding: Work supported by Brookhaven Science Associates, LLC under Contract No. DE-SC0012704 with the U.S. Department of Energy In RHIC low energy bunched beam cooling experiment, LEReC, a 704 MHz fiber laser is modulated such that when striking a photocathode, it produces corresponding electron bunches which are accelerated and transported to overlap an ion beam bunched at 9 MHz RF frequency The need for precise timing is handled well by the existing infrastructure. A layer of software application called the timing manager has been created to track the LEReC beam concerning the RHIC beam and allow instruments to be fired in real-time units instead of bunch timing or RHIC turns. The manager also automates set-tings of different modes based on the RF frequency and maintains the timing of instrumentation with a beam. A detailed description of the bunch structure and scheme of synchronizing the RF and laser pulses will be discussed in the paper. |
||
![]() |
Slides TUBPR05 [4.693 MB] | |
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-ICALEPCS2019-TUBPR05 | |
About • | paper received ※ 04 October 2019 paper accepted ※ 09 October 2019 issue date ※ 30 August 2020 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |