Author: Costanzo, M.R.
Paper Title Page
TUBPR05 LEReC Timing Synchronization with RHIC Beam 746
 
  • P.K. Kankiya, M.R. Costanzo, J.P. Jamilkowski
    BNL, Upton, New York, USA
 
  Funding: Work supported by Brookhaven Science Associates, LLC under Contract No. DE-SC0012704 with the U.S. Department of Energy
In RHIC low energy bunched beam cooling experiment, LEReC, a 704 MHz fiber laser is modulated such that when striking a photocathode, it produces corresponding electron bunches which are accelerated and transported to overlap an ion beam bunched at 9 MHz RF frequency The need for precise timing is handled well by the existing infrastructure. A layer of software application called the timing manager has been created to track the LEReC beam concerning the RHIC beam and allow instruments to be fired in real-time units instead of bunch timing or RHIC turns. The manager also automates set-tings of different modes based on the RF frequency and maintains the timing of instrumentation with a beam. A detailed description of the bunch structure and scheme of synchronizing the RF and laser pulses will be discussed in the paper.
 
slides icon Slides TUBPR05 [4.693 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-ICALEPCS2019-TUBPR05  
About • paper received ※ 04 October 2019       paper accepted ※ 09 October 2019       issue date ※ 30 August 2020  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)