A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z  

Takahashi, H.

Paper Title Page
WEP022 Timing Delay Management Database for J-PARC Linac and RCS 450
 
  • H. Takahashi, H. Yoshikawa
    JAEA/J-PARC, Tokai-Mura, Naka-Gun, Ibaraki-Ken
  • H. Sakaki
    JAEA, Kyoto
  • M. Sugimoto
    Mitsubishi Electric Control Software Corp, Kobe
 
  J-PARC Timing System is defined two kinds of timing, scheduled timing and synchronization timing. The scheduled timing is defined by a delay determined in advance from the reference trigger sent from the central timing control. Most devices and power supplies run with the scheduled timing. The scheduled timing system is configured one transmitter module in central control room and many receiver modules in device installed rooms (in total more than one hundred modules). Three signals which are the master clock, the reference trigger clock and the type, and LUT (Look-up Table) are distributed to the all receiver modules from transmitter module. An LUT is delay data block which is 256 * 8 array (The "256" is the number of "type", the "8" is the number of "trigger fan-out" per one receiver module). Then, a great number of "delay data" have to be managed for accelerator operation. The paper presents about the database to manage the timing delay for Linac and RCS*.

* 3GeV Rapid Cycling Synchrotron

 
TUP108 Control System for J-PARC Hadron Experimental Facility 331
 
  • Y. Sato, A. Agari, E. Hirose, M. Ieiri, Y. Katoh, A. Kiyomichi, M. Minakawa, R. Muto, M. Naruki, S. Sawada, Y. Shirakabe, Y. Suzuki, H. Takahashi, M. Takasaki, K. H. Tanaka, A. Toyoda, H. Watanabe, Y. Yamanoi
    KEK, Tsukuba
  • H. Noumi
    RCNP, Osaka
 
  J-PARC Hadron Experimental Facility is a multi-purpose research facility, using intense kaons and pions produced with 50GeV-15micro A (750kW) proton beams. In Hadron Experimental hall (HD-hall), the secondary kaon/pion beams are transported to the experimental areas and used for a variety of particle and nuclear physics experiments. In Janually 2009, the first beam was successfully extracted from the accelerator and transported to the beam dump in HD-hall. The present contribution reports the control system for the equipments on the beam lines and safety systems in Hadoron Experimental Facility, using EPCICS.