Paper | Title | Page |
---|---|---|
TPPB34 | ISAC Control System Update | 235 |
|
||
At the ISAC radioactive beam facility, the superconducting Linac was commissioned, and several experimental beam lines were added. The paper will describe the additions to the EPICS-based control system, issues with integration of third-party systems, as well as integration of accelerator controls with experiment controls. |