  The European Spallation Source (ESS), currently under construction and initial commissioning in Lund, Sweden, will be the brightest spallation neutron source in the world, when its driving proton linac achieves the design power of 5 MW at 2 GeV. Such a high power requires production, efficient acceleration, and almost no-loss transport of a high current beam, thus making design and beam commissioning of this machine challenging. During the the commissioning time in 2022 a campaign for a full characterisation of the ESS Medium Beta Transport session (MEBT) was carried out. Both transverse optics and longitudinal parameters were measured and compared to simulation, amongst them: buncher cavity tunning, trasnverse emittance and initial twiss parameters. In this paper we present the results and future plans.  
video icon
 
  please see instructions how to view/control embeded videos  
slides icon Slides MO2C2 [4.206 MB]  
DOI • reference for this paper ※ doi:10.18429/JACoW-IBIC2022-MO2C2  
About • Received ※ 07 September 2022 — Revised ※ 10 September 2022 — Accepted ※ 12 September 2022 — Issue date ※ 07 November 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUP35 First RF Phase Scans at the European Spallation Source 313
 
  • Y. Levinsen, R.A. Baron, E.M. Donegani, M. Eshraqi, A. Garcia Sosa, H. Hassanzadegan, B. Jones, N. Milas, R. Miyamoto, D. Noll, I. Vojskovic, R.H. Zeng
    ESS, Lund, Sweden
  • M. Akhyani
    EPFL, Lausanne, Switzerland
  • I. Bustinduy
    ESS Bilbao, Zamudio, Spain
  • F. Grespan
    INFN/LNL, Legnaro (PD), Italy
 
  The installation and commissioning of the European Spallation Source is currently underway at full speed, with the goal to be ready for first neutron production by end of 2024. This year we accelerated protons through the first DTL tank. This included the RFQ, 3 buncher cavities in the medium energy beam transport as well as the DTL tank itself as RF elements. At the end of the DTL tank we had a Faraday cup acting as the effective beam stop. This marks the first commissioning when RF matching is required for beam transport. In this paper we discuss the phase scan measurements and analysis of the buncher cavities and the first DTL tank.  
DOI • reference for this paper ※ doi:10.18429/JACoW-IBIC2022-TUP35  
About • Received ※ 08 September 2022 — Revised ※ 10 September 2022 — Accepted ※ 12 September 2022 — Issue date ※ 03 October 2022