N. Milas, M. Akhyani, R.A. Baron, C.S. Derrez, M. Eshraqi, Y. Levinsen, R. Miyamoto, D. Noll, R. Tarkeshian, I. Vojskovic, R.H. Zeng
ESS, Lund, Sweden
The European Spallation Source (ESS), currently under construction and initial commissioning in Lund, Sweden, will be the brightest spallation neutron source in the world, when its driving proton linac achieves the design power of 5 MW at 2 GeV. Such a high power requires production, efficient acceleration, and almost no-loss transport of a high current beam, thus making design and beam commissioning of this machine challenging. During the the commissioning time in 2022 a campaign for a full characterisation of the ESS Medium Beta Transport session (MEBT) was carried out. Both transverse optics and longitudinal parameters were measured and compared to simulation, amongst them: buncher cavity tunning, trasnverse emittance and initial twiss parameters. In this paper we present the results and future plans.
please see instructions how to view/control embeded videos
Beam Instrumentation Performance During Commissioning of the ESS RFQ, MEBT and DTL
32
T.J. Shea, R.A. Baron, C.S. Derrez, E.M. Donegani, V. Grishin, H. Hassanzadegan, I. Kittelmann, H. Kocevar, N. Milas, D. Noll, H.A. Silva, R. Tarkeshian, C.A. Thomas
ESS, Lund, Sweden
I. Bustinduy
ESS Bilbao, Zamudio, Spain
M. Ferianis
Elettra-Sincrotrone Trieste S.C.p.A., Basovizza, Italy
T. Papaevangelou, L. Seguí
CEA-IRFU, Gif-sur-Yvette, France
In late 2021 through mid 2022, the first protons were accelerated and transported through the European Spallation Source (ESS) Radio Frequency Quadrupole and Medium Energy Transport line at 3.6 MeV, and finally through the first Drift Tube Linac tank at 21 MeV. To enable these achievements, the following beam instrumentation systems were deployed: Ion Source power supply monitors, beam chopping systems, Faraday Cups, Beam Current Monitors (BCM) and Beam Position Monitors (BPM) that also measured phase. Additional systems were deployed for dedicated studies, including Wire Scanners, a slit and grid Emittance Measurement Unit, neutron Beam Loss Monitors and fast BCM and BPM systems. The instrumentation deployment is the culmination of efforts by a partnership of the ESS beam diagnostics section, multiple ESS groups and institutes across the globe. This paper summarizes the beam tests that characterized the performance of the instrumentation systems and verified the achievement of commissioning goals.