Author: Perez Juarez, E.P.J.
Paper Title Page
MO3C2 Diamond-II Electron Beam Position Monitor Development 168
 
  • L.T. Stant, M.G. Abbott, L. Bobb, G. Cook, L. Hudson, A.F.D. Morgan, E.P.J. Perez Juarez, A.J. Rose, A. Tipper
    DLS, Harwell, United Kingdom
 
  The UK national synchrotron facility, Diamond Light Source, is preparing for a major upgrade to the accelerator complex. Improved beam stability requirements necessitate the fast orbit feedback system be driven from beam position monitors with lower noise and drift performance than the existing solution. Short-term beam motion must be less than 2 nm/sqrt(Hz) over a period of one second with a data rate of 100 kHz, and long-term peak-to-peak beam motion must be less than 1 µm. A new beam position monitor is under development which utilises the pilot-tone correction method to reduce front-end and cabling perturbations to the button signal; and a MicroTCA platform for digital signal processing to provide the required data streams. This paper discusses the challenges faced during the design of the new system and presents experimental results from testing on the existing machine.  
video icon
 
  please see instructions how to view/control embeded videos  
slides icon Slides MO3C2 [1.714 MB]  
DOI • reference for this paper ※ doi:10.18429/JACoW-IBIC2022-MO3C2  
About • Received ※ 06 September 2022 — Revised ※ 11 September 2022 — Accepted ※ 12 September 2022 — Issue date ※ 17 October 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)