Author: Hubert, N.
Paper Title Page
TUP09 Design of the Beam Position Monitor for SOLEIL II 233
 
  • M. El Ajjouri, F. Alves, A. Gamelin, N. Hubert
    SOLEIL, Gif-sur-Yvette, France
 
  The Beam Position Monitors for the SOLEIL low emittance upgrade project are in the design phase. Efforts are put on the minimization of the heat load on the button by optimizing the longitudinal impedance and the BPM materials. To validate the mechanical design and tolerances a first prototype has been manufactured and controlled. This paper presents the mechanical design of the BPM, the metrology of the prototype and the lessons learned from this prototyping phase.  
DOI • reference for this paper ※ doi:10.18429/JACoW-IBIC2022-TUP09  
About • Received ※ 10 September 2022 — Revised ※ 11 September 2022 — Accepted ※ 13 September 2022 — Issue date ※ 07 November 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUP19 Visible Range Polarized Imaging for High Resolution Transverse Beam Size Measurement at SOLEIL 269
 
  • M. Labat, A. Bence, A. Berlioux, B. Capitanio, G. Cauchon, J. Da Silva, N. Hubert, D. Pédeau, M. Thomasset
    SOLEIL, Gif-sur-Yvette, France
 
  SOLEIL storage ring is presently equipped with three diagnostics beamlines: two in the X-ray range (pinhole cameras) and one in the visible range. The visible range beamline relies on a slotted copper mirror extracting the synchrotron radiation from one of the ring dipoles. The extracted radiation is then transported down to a dedicated hutch in the experimental hall. Up to now, this radiation was split into three branches for rough monitoring of the beam transverse stability, bunch length measurements and filling pattern measurements. In the framework of SOLEIL’s upgrade, we now aim at developing a new branch for high resolution beam size measurement using polarized imaging. This work presents the various modifications recently achieved on the beamline to reach this target, including a replacement of the extraction mirror, and preliminary results towards transverse beam size measurement.  
DOI • reference for this paper ※ doi:10.18429/JACoW-IBIC2022-TUP19  
About • Received ※ 09 September 2022 — Revised ※ 10 September 2022 — Accepted ※ 13 September 2022 — Issue date ※ 25 September 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUP42 Fast Orbit Feedback Upgrade at SOLEIL 339
 
  • R. Broucquart, N. Hubert
    SOLEIL, Gif-sur-Yvette, France
 
  In the framework of the SOLEIL II project, the diagnostics group must anticipate ahead of the dark period the upgrade of important system like the BPM electronics, the timing system end the Fast Orbit Feedback (FOFB). The FOFB is a complex system that is currently embedded in the BPM electronics modules (eBPM). A new flexible stand-alone platform is under conception to follow the future upgrades of surrounding equipment, and to allow the integration of future correction schemes. In this paper we will present the current status of technical decisions, tests and developments.  
poster icon Poster TUP42 [3.305 MB]  
DOI • reference for this paper ※ doi:10.18429/JACoW-IBIC2022-TUP42  
About • Received ※ 07 September 2022 — Revised ※ 10 September 2022 — Accepted ※ 12 September 2022 — Issue date ※ 25 September 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)