Author: Garcia Sosa, A.
Paper Title Page
TUP35 First RF Phase Scans at the European Spallation Source 313
 
  • Y. Levinsen, R.A. Baron, E.M. Donegani, M. Eshraqi, A. Garcia Sosa, H. Hassanzadegan, B. Jones, N. Milas, R. Miyamoto, D. Noll, I. Vojskovic, R.H. Zeng
    ESS, Lund, Sweden
  • M. Akhyani
    EPFL, Lausanne, Switzerland
  • I. Bustinduy
    ESS Bilbao, Zamudio, Spain
  • F. Grespan
    INFN/LNL, Legnaro (PD), Italy
 
  The installation and commissioning of the European Spallation Source is currently underway at full speed, with the goal to be ready for first neutron production by end of 2024. This year we accelerated protons through the first DTL tank. This included the RFQ, 3 buncher cavities in the medium energy beam transport as well as the DTL tank itself as RF elements. At the end of the DTL tank we had a Faraday cup acting as the effective beam stop. This marks the first commissioning when RF matching is required for beam transport. In this paper we discuss the phase scan measurements and analysis of the buncher cavities and the first DTL tank.  
DOI • reference for this paper ※ doi:10.18429/JACoW-IBIC2022-TUP35  
About • Received ※ 08 September 2022 — Revised ※ 10 September 2022 — Accepted ※ 12 September 2022 — Issue date ※ 03 October 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)