Author: Degl’Innocenti, I.
Paper Title Page
WEP12 HL-LHC BPM System Development Status 408
 
  • M. Krupa, I. Degl’Innocenti, D. Gudkov, G. Schneider
    CERN, Meyrin, Switzerland
  • D.R. Bett
    JAI, Oxford, United Kingdom
 
  The demanding instrumentation requirements of the future High Luminosity LHC (HL-LHC) require 44 newly designed Beam Position Monitors (BPM) to be installed around the ATLAS and CMS experiments in 2026-2028. Three BPM types are now in pre-series production, with two more variants under design. Close to the collision point, a set of cryogenic directive coupler BPMs equipped with a brand new acquisition system based on nearly-direct digitization will resolve the position of the two counter-rotating LHC beams occupying a common vacuum chamber. Other new button and stripline BPMs will provide not only the transverse beam position, but also timing signals for the experiments, and diagnostics for the new HL-LHC crab cavities. This contribution summarizes the HL-LHC BPM specifications, gives an overview of the new BPM designs, reports on the pre-series BPM production status and plans for series manufacturing, outlines the foreseen acquisition system architecture, and highlights the first beam measurements carried out with the proof-of-concept electronics for the directive stripline BPMs.  
DOI • reference for this paper ※ doi:10.18429/JACoW-IBIC2022-WEP12  
About • Received ※ 09 September 2022 — Revised ※ 10 September 2022 — Accepted ※ 11 September 2022 — Issue date ※ 03 October 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)