Author: Breunlin, J.
Paper Title Page
WE2C2 Beam Stability in the MAX IV 3 GeV Storage Ring 370
 
  • J. Breunlin, G. Felcsuti
    MAX IV Laboratory, Lund University, Lund, Sweden
 
  The MAX IV Laboratory, inaugurated in 2016, hosts a 3 GeV ultra-low emittance storage ring, a 1.5 GeV storage ring and a linear accelerator driven Short Pulse Facility to deliver synchrotron radiation to scientific users. A Stability Task Force has been assigned to ensure the delivery of stable beams since early on in the design phase of the laboratory and is continuing its work in an ongoing and multi-disciplinary effort. Measurements of the electron beam stability resulting from the passive stabilization approach taken for the two storage rings will be presented, as well as figures of beam stability with the Fast Orbit Feedback system in operation. Each ID beamline in the 3 GeV storage ring is equipped with a pair photon beam position monitors that are currently used to complement the electron beam position monitors. In the light of the city development around the MAX IV campus, maintaining the good mechanical stability of the laboratory has to be seen as an ongoing effort. A number of studies are being performed to identify possible risks and to decide where measures need to be taken.  
video icon
 
  please see instructions how to view/control embeded videos  
slides icon Slides WE2C2 [1.905 MB]  
DOI • reference for this paper ※ doi:10.18429/JACoW-IBIC2022-WE2C2  
About • Received ※ 12 September 2022 — Accepted ※ 15 September 2022 — Issue date ※ 12 October 2022  
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)