WEP12 |
HL-LHC BPM System Development Status |
408 |
|
- M. Krupa, I. Degl’Innocenti, D. Gudkov, G. Schneider
CERN, Meyrin, Switzerland
- D.R. Bett
JAI, Oxford, United Kingdom
|
|
|
The demanding instrumentation requirements of the future High Luminosity LHC (HL-LHC) require 44 newly designed Beam Position Monitors (BPM) to be installed around the ATLAS and CMS experiments in 2026-2028. Three BPM types are now in pre-series production, with two more variants under design. Close to the collision point, a set of cryogenic directive coupler BPMs equipped with a brand new acquisition system based on nearly-direct digitization will resolve the position of the two counter-rotating LHC beams occupying a common vacuum chamber. Other new button and stripline BPMs will provide not only the transverse beam position, but also timing signals for the experiments, and diagnostics for the new HL-LHC crab cavities. This contribution summarizes the HL-LHC BPM specifications, gives an overview of the new BPM designs, reports on the pre-series BPM production status and plans for series manufacturing, outlines the foreseen acquisition system architecture, and highlights the first beam measurements carried out with the proof-of-concept electronics for the directive stripline BPMs.
|
|
DOI • |
reference for this paper
※ doi:10.18429/JACoW-IBIC2022-WEP12
|
|
About • |
Received ※ 09 September 2022 — Revised ※ 10 September 2022 — Accepted ※ 11 September 2022 — Issue date ※ 03 October 2022 |
Cite • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|