Paper | Title | Page |
---|---|---|
MOPP33 | BPM System for the PIP-II Injector Test Facility | 133 |
|
||
Funding: Work supported by the Fermi National Accelerator Laboratory, managed and operated by Fermi Research Alliance, LLC under Contract No. DE-AC02-07CH11359 with the U.S. Department of Energy. A new BPM system was used for commissioning and operation of the PIP2 Injector Test Facility. The system of 13 warm and 12 cold BPMs was based upon custom 250 MS/s digitizers controlled and readout over gigabit ethernet by a single multi-core rackmount server running linux. The system provided positions, intensity, and phase for each bpm as a pulse average or pulse waveform from 10 us to 4 ms at a 20 Hz pulse repetition rate. |
||
![]() |
Poster MOPP33 [1.712 MB] | |
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IBIC2021-MOPP33 | |
About • | paper received ※ 10 September 2021 paper accepted ※ 17 September 2021 issue date ※ 10 October 2021 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
MOPP41 |
A New Digital SSB Longitudinal Feedback System for the Fermilab Booster | |
|
||
Funding: Work supported by the Fermi National Accelerator Laboratory, managed and operated by Fermi Research Alliance, LLC under Contract No. DE-AC02-07CH11359 with the U.S. Department of Energy. The Booster Longitudinal Mode Feedback System has been upgraded to single sideband system with improved ability to measure Beam Transfer Function for each mode. The new system provide feedback via either dedicated mode cavites or via the Booster RF system. It also provides diagnostic capabilities for tracking the sidebands of any Booster mode after transition crossing. |
||
![]() |
Poster MOPP41 [1.585 MB] | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |