JACoW logo

Joint Accelerator Conferences Website

The Joint Accelerator Conferences Website (JACoW) is an international collaboration that publishes the proceedings of accelerator conferences held around the world.


BiBTeX citation export for MOPP03: SOLEIL Upgrade Project and Foreseen Beam Instrumentation

@inproceedings{hubert:ibic2021-mopp03,
  author       = {N. Hubert and A. Bence and R. Broucquart and M. El Ajjouri and M. Labat and D. Pédeau and J.P. Ricaud},
% author       = {N. Hubert and A. Bence and R. Broucquart and M. El Ajjouri and M. Labat and D. Pédeau and others},
% author       = {N. Hubert and others},
  title        = {{SOLEIL Upgrade Project and Foreseen Beam Instrumentation}},
  booktitle    = {Proc. IBIC'21},
  pages        = {26--29},
  eid          = {MOPP03},
  language     = {english},
  keywords     = {electron, electronics, diagnostics, synchrotron, emittance},
  venue        = {Pohang, Rep. of Korea},
  series       = {International Beam Instrumentation Conference},
  number       = {10},
  publisher    = {JACoW Publishing, Geneva, Switzerland},
  month        = {10},
  year         = {2021},
  issn         = {2673-5350},
  isbn         = {978-3-95450-230-1},
  doi          = {10.18429/JACoW-IBIC2021-MOPP03},
  url          = {https://jacow.org/ibic2021/papers/mopp03.pdf},
  note         = {https://doi.org/10.18429/JACoW-IBIC2021-MOPP03},
  abstract     = {{SOLEIL Synchrotron has an upgrade plan to replace its storage ring by a new one based on multi-bend (7/4BA) achromat lattice. The Conceptual Design Report (CDR) has been published recently and the Technical Design Report (TDR) phase should be finished for the end of 2023. For the beam instrumentation, most of the equipment will have to be replaced, to overcome cases of electronics obsolescence and to fulfil the new tight requirements. Among them, the most challenging ones are the micron resolution transverse beam size measurement, the beam position monitoring and the stability feedbacks. The present machine will be used to validate some prototypes and it is planned to upgrade part of the diagnostics ahead of the dark period to speed-up the commissioning of the new storage ring. This paper will present the diagnostics systems that are foreseen for the SOLEIL upgrade project.}},
}