The Joint Accelerator Conferences Website (JACoW) is an international collaboration that publishes the proceedings of accelerator conferences held around the world.
@inproceedings{chung:ibic2021-moob03,
author = {Y.S. Chung and G.D. Kim and J.W. Kwon and E.H. Lim and H.J. Woo},
title = {{Overview of RAON Beam Instrumentation System and Construction Status of the Low-Energy Linac}},
booktitle = {Proc. IBIC'21},
pages = {13--15},
eid = {MOOB03},
language = {english},
keywords = {linac, MMI, LEBT, diagnostics, instrumentation},
venue = {Pohang, Rep. of Korea},
series = {International Beam Instrumentation Conference},
number = {10},
publisher = {JACoW Publishing, Geneva, Switzerland},
month = {10},
year = {2021},
issn = {2673-5350},
isbn = {978-3-95450-230-1},
doi = {10.18429/JACoW-IBIC2021-MOOB03},
url = {https://jacow.org/ibic2021/papers/moob03.pdf},
note = {https://doi.org/10.18429/JACoW-IBIC2021-MOOB03},
abstract = {{RAON is a heavy ion accelerator for researches using Rare Isotopes (RI) as a major research facility in Korea. RAON uses both In-flight Fragmentation and Isotope Separation On-Line methods to provide various RI beams. The ultimate goal of the driver Linac of RAON is to accelerate uranium and proton beams up to 200 MeV/u and 600 MeV, with a maximum beam currents of 8.3 pA and 660 pA, respectively. After 9 years of RAON construction, commissioning of the low-energy Linac front-end system that consists of 14.5 GHz ion source, low energy beam transport, a 500 keV/u radio frequency quadrupole, and medium energy beam transport has been carried out since late 2020. And beam injection to the low-energy superconducting Linac is planned to start in December 2021. Here, we introduce RAON beam instrumentation and diagnostics systems as well as the construction status of the low-energy Linac.}},
}