Author: Kuklev, N.
Paper Title Page
MOBO02 Beam Instrumentation at the Fermilab IOTA Ring 22
 
  • N. Eddy, D.R. Broemmelsiek, K. Carlson, D.J. Crawford, J.S. Diamond, D.R. Edstrom, B.J. Fellenz, M.A. Ibrahim, J.D. Jarvis, V.A. Lebedev, S. Nagaitsev, J. Ruan, J.K. Santucci, A. Semenov, V.D. Shiltsev, G. Stancari, A. Valishev, D.C. Voy, A. Warner
    Fermilab, Batavia, Illinois, USA
  • N. Kuklev, I. Lobach
    University of Chicago, Chicago, Illinois, USA
  • S. Szustkowski
    Northern Illinois University, DeKalb, Illinois, USA
 
  Funding: This manuscript has been authored by Fermi Research Alliance, LLC under Contract No. DE-AC02-07CH11359 with the U.S. Department of Energy, Office of Science, Office of High Energy Physics.
The Integrable Optics Test Accelerator (IOTA) is a storage ring at the end of the Fermilab Accelerator Science and Technology (FAST) facility. The complex is intended to support accelerator R&D for the next generation of particle accelerators. The IOTA ring is currently operating with 150 MeV electrons injected from the FAST Linac and will also receive 2.5 MeV protons from the IOTA Proon Injector currently be installed. The current instrumentation and results along from the first electron commissioning run will be presented along with future plans.
 
slides icon Slides MOBO02 [47.588 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IBIC2019-MOBO02  
About • paper received ※ 09 September 2019       paper accepted ※ 10 September 2019       issue date ※ 10 November 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPP042 Turn-by-Turn Synchrotron Radiation Transverse Profile Monitor for IOTA 432
 
  • N. Kuklev, Y.K. Kim
    University of Chicago, Chicago, Illinois, USA
 
  Funding: Work supported by National Science Foundation award PHY-1549132, the Center for Bright Beams. Fermi Research Alliance operates Fermilab under Contract DE-AC02-07CH11359 with the US Dept. of Energy.
The Integrable Optics Test Accelerator is a research electron and proton storage ring recently commissioned at Fermilab. A key part of its beam diagnostics suite are synchrotron radiation monitors, used for measuring transverse beam profile, position, and intensity. So far, this system has used only visible light cameras, which are optimal for orbit measurements but do not provide turn-by-turn temporal resolution needed for beam dynamics analysis. Current electrostatic BPM system, while capable of turn-by-turn acquisition, will be pushed to its limits of accuracy and linearity by the requirements of planned nonlinear integrable optics experiments, and furthermore does not provide transverse profile data. To address these drawbacks, we present in this paper the design of a turn-by-turn BPM system based on a multi-anode photomultiplier detector. Extensive simulations are shown, combining both particle and optics tracking. A potential hardware and readout architecture is described. Statistical and systematic errors are explored. We conclude by outlining the prototype testing plans for run 2 in the fall of 2019, and other future work.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IBIC2019-TUPP042  
About • paper received ※ 11 September 2019       paper accepted ※ 12 September 2019       issue date ※ 10 November 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)