Commissioning of the Beam Instrumentation for the Half Sector Test in Linac4 with a 160 MeV H− Beam |
117 |
|
- G. Guidoboni, J.C.A. Allica, C. Bracco, S. Burger, G.J. Focker, B. Mikulec, A. Navarro Fernandez, F. Roncarolo, L. Søby, C. Zamantzas
CERN, Geneva, Switzerland
|
|
|
In the framework of the LHC Injector Upgrade (LIU) project, the Proton Synchrotron Booster (PSB) will be extensively modified during the Long Shutdown 2 (LS2, 2019-2020) at CERN [1]. This includes a new injector, Linac4, which will provide a 160 MeV H− beam and a complete new injection section for the PSB composed essentially of a chicane and a stripping foil system. The equivalent of half of this new injection chicane, so-called Half-Sector Test (HST), was tempo-rarily installed in the Linac4 transfer line to evaluate the performance of the novel beam instrumentation, such as, stripping foils, monitoring screens, beam cur-rent transformers, H0/H− monitor and dump, beam loss monitors, and beam position monitors. The results of the instrumentation commissioning of the HST are presented in this paper.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IBIC2017-MOPWC07
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|