| DOI | Title |
|---|---|
| doi:10.18429/JACoW-IBIC2016-TUPG59 | Bunch Extension Monitor for LINAC of SPIRAL2 Project |
| doi:10.18429/JACoW-IBIC2016-WEPG11 | Operation of the Beam Position Monitor for the Spiral 2 Linac on the Test Bench of the RFQ |
| doi:10.18429/JACoW-IBIC2016-WEPG39 | Measurement Uncertainty Assessments of the SPIRAL2 ACCT/DCCT |
| doi:10.18429/JACoW-IBIC2016-WEPG42 | Energy and Longitudinal Bunch Measurements at the SPIRAL2 RFQ Exit |