Commissioning of the Bunch-by-Bunch Transverse Feedback System for the TPS Storage Ring |
612 |
|
- Y.-S. Cheng, K.T. Hsu, K.H. Hu, C.H. Huang, C.Y. Liao
NSRRC, Hsinchu, Taiwan
|
|
|
TPS finish its Phase II commissioning in December of 2015 after installation of two superconducting RF cavities and ten sets of insertion devices in mid-2015. Storage beam current up to 520 mA was achieved. Intensive insertion devices commissioning were performed in March 2016 and delivery beam for beam-line commissioning and perform pilot experiments. One horizontal stripline kicker and two vertical stripline kickers were installed in May 2015. Bunch-by-bunch feedback system were commissioning in late 2015. Commercial available feedback processor was selected for the feedback system integration. Beam property and performance of the feedback system were measured. Results will summary in this report.
|
|
DOI • |
reference for this paper
※ DOI:10.18429/JACoW-IBIC2016-WEPG02
|
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|