Author: Le Coz, W.LC.
Paper Title Page
WEPG42 Energy and Longitudinal Bunch Measurements at the SPIRAL2 RFQ Exit 723
 
  • C. Jamet, W.LC. Le Coz, G. Ledu, S. Loret, C. Potier de courcy
    GANIL, Caen, France
 
  A new step of the SPIRAL2 commissioning started in December 2015 with the acceleration of a first proton beam at the RFQ exit. A test bench, with all the different diagnostics which will be used on the SPIRAL2 accelerator, was installed directly after the first rebuncher of the MEBT line in order to qualify beams but also to test and make reliable the diagnostic monitors. In 2016, different ion beams are qualified by the diagnostic test bench. This paper describes the results of the energy measurements done by a Time of Flight monitor and the longitudinal measurements using a fast faraday cup.  
poster icon Poster WEPG42 [3.072 MB]  
DOI • reference for this paper ※ DOI:10.18429/JACoW-IBIC2016-WEPG42  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)