Author: Cheng, Y.-S.
Paper Title Page
MOPG11 Beam Commissioning of TPS Fast Orbit Feedback System 59
 
  • P.C. Chiu, Y.-S. Cheng, K.T. Hsu, K.H. Hu, C.H. Huang
    NSRRC, Hsinchu, Taiwan
 
  Submicron orbit stability for a low emittance synchrotron light source are essential. Besides locating and removing the existing perturbations, active orbit feedback is applied to improve the orbit stability below sub-micron range from DC to a few hundreds of Hertz. Efforts to investigate orbit stability and stabilization at TPS will be addressed in this report.  
DOI • reference for this paper ※ DOI:10.18429/JACoW-IBIC2016-MOPG11  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPG02 Commissioning of the Bunch-by-Bunch Transverse Feedback System for the TPS Storage Ring 612
 
  • Y.-S. Cheng, K.T. Hsu, K.H. Hu, C.H. Huang, C.Y. Liao
    NSRRC, Hsinchu, Taiwan
 
  TPS finish its Phase II commissioning in December of 2015 after installation of two superconducting RF cavities and ten sets of insertion devices in mid-2015. Storage beam current up to 520 mA was achieved. Intensive insertion devices commissioning were performed in March 2016 and delivery beam for beam-line commissioning and perform pilot experiments. One horizontal stripline kicker and two vertical stripline kickers were installed in May 2015. Bunch-by-bunch feedback system were commissioning in late 2015. Commercial available feedback processor was selected for the feedback system integration. Beam property and performance of the feedback system were measured. Results will summary in this report.  
DOI • reference for this paper ※ DOI:10.18429/JACoW-IBIC2016-WEPG02  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)