POS05 Status of Taiwan Light Source and Future Plan  
 
  • P. J. Chou, H.-P. Chang, C.-S. Hwang, C.-C. Kuo, G.-H. Luo, H.-J. Tsai, Ch. Wang, M.-H. Wang
    NSRRC, Hsinchu
 
  Several major upgrades have been integrated into routine operation in Taiwan Light Source (TLS). Top-up injection mode was achieved after series of efforts to upgrade the injector, transfer line and injection components. The operation current of Top-up injection has reached 300 mA during users shift. The commissioning of the first and second Superconducting RF cavities (SRF) was very successful and exceeded the specification in several measures. The first In-Archromat Superconducting Wiggler (IASW) was installed and commissioned successfully. The associated beamlines will be commissioned in the second half-year of 2006. A 3 GeV low emittance light source has been proposed as the next major upgrade. Intensive design efforts are in progress.