TUPPH019 |
Simulations for the LCLS Injector
|
260 |
|
- Y. T. Ding, D. Dowell, P. Emma, J. C. Frisch, A. Gilevich, G. R. Hays, P. Hering, Z. Huang, R. H. Iverson, P. Krejcik, H. Loos, A. Miahnahri, J. F. Schmerge, J. L. Turner, W. E. White, J. Wu, C. Limborg-Deprey
SLAC, Menlo Park, California
|
|
|
The commissioning of the LCLS Injector has started this year. The electron beam quality for producing high power SASE X-rays is very challenging to reach. In this paper, we will describe comparisons between simulations made with multi-particle tracking code and electron beam measurements performed on the LCLS injector.
|
|
WEAAU01 |
Commissioning Results of the SLAC LCLS Gun
|
276 |
|
- R. Akre, J. Castro, P. Emma, J. C. Frisch, A. Gilevich, G. R. Hays, P. Hering, R. H. Iverson, P. Krejcik, C. Limborg-Deprey, H. Loos, A. Miahnahri, J. F. Schmerge, J. L. Turner, J. J. Welch, W. E. White, J. Wu, D. Dowell
SLAC, Menlo Park, California
|
|
|
The beam quality and operational requirements for the Linac Coherent Light Source (LCLS) currently being constructed at SLAC are exceptional, requiring the design of a new s-band RF photocathode gun for the electron source. Two guns (Gun1 and Gun2) have been fabricated and tested at high RF power. Gun1 was installed March 17, 2007 and began providing beams for the LCLS injector commissioning on April 5, 2007. Gun2 is reserved as a backup gun. The results and analysis of the guns performance in the LCLS injector will be presented.
|
|
|