Yabashi, M.
Paper | Title | Page |
---|---|---|
MOPP018 | Status of R&D for SCSS Project | 75 |
|
||
Funding: Representing the SCSS project team SCSS, an acronym of "SPring-8 Compact SASE Source", is an X-ray FEL project under planning to be build at the SPring-8 site. R&Ds for accelerator components such as the pulsed-DC electron gun, C-band main linac, and in-vacuum short period undulator have been performed and almost completed. Before construction of the X-ray FEL facility, a prototype accelerator with the electron energy of 250 MeV is being built to demonstrate the concept of SCSS. In this presentation, status of the R&Ds for each accelerator component will be presented together with an overview of the 250-Mev prototype accelerator. |
||