Author Index: A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z

Palumbo, L.

Paper Title Page
MOPP026 Simulations, Diagnostics and Recent Results of the VISA II Experiment 83
 
  • G. Andonian, A.Y. Murokh, C. Pellegrini, S. Reiche, J.B. Rosenzweig, G. Travish
    UCLA, Los Angeles, California
  • M. Babzien, I. Ben-Zvi, V. Litvinenko, V. Yakimenko
    BNL, Upton, Long Island, New York
  • I. Boscolo, S. Cialdi, A.F. Flacco
    INFN-Milano, Milano
  • M. Ferrario, L. Palumbo, C. Vicario
    INFN/LNF, Frascati (Roma)
  • J.Y. Huang
    POSTECH, Pohang, Kyungbuk
 
 

The VISA II experiment entails use of a chirped beam to drive a high gain SASE FEL. The output radiation is diagnosed with a modified frequency resolved optical gating (FROG) technique. Sextupoles are implemented to correct the lonigtudinal aberrations affecting the high energy spread chirped beam during transport to the undulator. The double differential energy spectrum is measured with a pair of slits and a set of gratings. In this paper, we report on start-to-end simulations, radiation diagnostics, as well as intial experimental results; experimental methods are described.

 
   
MOPP015 Beam Dynamics Studies for the SPARXINO Linac 67
 
  • M. Boscolo, M. Ferrario, V. Fusco, B. Spataro, C. Vaccarezza
    INFN/LNF, Frascati (Roma)
  • L. Giannessi, M. Quattromini, C. Ronsivalle
    ENEA C.R. Frascati, Frascati (Roma)
  • M.  Migliorati, L. Palumbo
    Rome University La Sapienza, Roma
  • L. Serafini
    INFN-Milano, Milano
 
 

The first phase of the SPARX project is essentially an R&D activity focused on developing techniques and critical components for future X-ray FEL facilities. The SPARXINO test facility will generate ultra-high peak brightness electron beams at 1 GeV, thanks to the upgrade of the existing Frascati 800 MeV linac. This facility will allow driving a single pass FEL experiment in the range of 3-5 nm, both in SASE and SEEDED FEL configurations. A peculiarity of this linac design is the choice of integrating a rectilinear RF compressor in the early stage of the acceleration, producing a 300-500 A beam, with a magnetic chicane afterwards, for a further compression up to 1 kA. In this paper we discuss the dynamics of the beam, which is in the space charge dominated regime throughout almost all the linac. Start to end simulations and preliminary stability studies taking into account some significant parameter fluctuations are also reported.

 
   
MOPP014 Status of the Seeding Experiment at SPARC 63
 
  • L. Giannessi, M.C. Carpanese, F. Ciocci, G. Dattoli, A. Dipace, A. Doria, G.P. Gallerano, E. Giovenale, G. Parisi, M. Quattromini, A. Renieri, C. Ronsivalle, E. Sabia, S. Spampinati, I.P. Spassovsky
    ENEA C.R. Frascati, Frascati (Roma)
  • D. Alesini, M.E. Biagini, A. Drago, M. Ferrario, V. Fusco, A. Ghigo, B. Spataro, C. Vaccarezza, C. Vicario
    INFN/LNF, Frascati (Roma)
  • M. Bougeard, B. Carre, M.-E. Couprie, D. Garzella, M. LABAT, G. Lambert, H. Merdji, P. Salieres
    CEA/Saclay, Gif-sur-Yvette
  • M. Mattioli, P. Musumeci, M. Petrarca
    Universita di Roma I La Sapienza, Roma
  • M.  Migliorati, L. Palumbo
    Rome University La Sapienza, Roma
  • M. Nisoli, S. Stagira, S. de Silvestri
    Politecnico/Milano, Milano
  • L. P. Poletto, G. T. Tondello
    Univ. degli Studi di Padova, Padova
 
 

Funding: Work supported by the EU Commission in the sixth framework programme, contract no. 011935 – EUROFEL.

Sources based on high order harmonics generated in gas with high power Ti:Sa lasers pulses represent promising candidates as seed for FEL amplifiers for several reasons, as spatial and temporal coherence, wavelength tunability and spectral range, which extends down to the 10(-9)m wavelength scale. This communication is devoted to the description of a research work plan that will be implemented at the SPARC FEL facility in the framework of the EUROFEL programme. The main goal of the collaboration is to study and test the amplification and the FEL harmonic generation process of an input seed signal obtained as higher order harmonics generated both in crystal (400nm and 266 nm) and in gas (266nm, 160nm, 114nm) from a high intensity Ti:Sa laser pulse.

 
   
THPP043 Status and First Results from the Upgraded PITZ Facility 564
 
  • A. Oppelt, K. Abrahamyan, G. Asova, J.W. Baehr, G. Dimitrov, U. Gensch, H.-J. Grabosch, J.H. Han, S. Khodyachykh, G. Klemz, M. Krasilnikov, S. Liu, V. Miltchev, B. Petrosyan, S. Riemann, L. Staykov, F. Stephan
    DESY Zeuthen, Zeuthen
  • W. Ackermann, W.F.O. Muller, S. Schnepp, T. Weiland
    TEMF, Darmstadt
  • D. Alesini, M. Boscolo, G. Di Pirro, M. Ferrario, D. Filippetto, L. Palumbo, C. Vicario
    INFN/LNF, Frascati (Roma)
  • V. Boccone
    Humboldt Universität zu Berlin, Berlin
  • L. Catani, E. Chiadroni, A. Cianchi
    INFN-Roma II, Roma
  • K. Floettmann, S. Schreiber
    DESY, Hamburg
  • T. Garvey
    LAL, Orsay
  • M.V. Hartrott, E. Jaeschke, D. Kraemer, D. Lipka, F. Marhauser, R. Richter
    BESSY GmbH, Berlin
  • P. Michelato, L. Monaco, C. Pagani, D. Sertore
    INFN/LASA, Segrate (MI)
  • V.V. Paramonov
    RAS/INR, Moscow
  • N. Pavel
    Humboldt University Berlin, Institut für Physik, Berlin
  • J.R. Roensch, J. Rossbach
    Uni HH, Hamburg
  • W. Sandner, I. Will
    MBI, Berlin
  • I. Tsakov
    INRNE, Sofia
 
 

Funding: This work has been partly supported by the European Community, contract numbers RII3-CT-2004-506008 and 011935, and by the 'Impuls- und Vernetzungsfonds" of the Helmholtz Association, contract number VH-FZ-05.

Since December 2004, the photo injector test facility at DESY in Zeuthen (PITZ) has been upgraded. A normal conducting copper booster cavity has been installed and the diagnostics beamline has been strongly modified. An extended water cooling system has been installed and was successfully taken into operation. Actually, the new diagnostics elements are being commissioned. After the installation of the new 10 MW klystron in June/July, the gun can be conditioned towards higher average power, and the whole beamline including the booster will be taken into operation. First results from the commissioning phase including gun and booster conditioning are reported.

 
   
THPP019 Status of the SPARX FEL Project 491
 
  • L. Palumbo
    Rome University La Sapienza, Roma
  • D. Alesini, M. Bellaveglia, S. Bertolucci, M.E. Biagini, R. Boni, M. Boscolo, M. Castellano, A. Clozza, G. Di Pirro, A. Drago, A. Esposito, M. Ferrario, D. Filippetto, V. Fusco, A. Gallo, A. Ghigo, S. Guiducci, M.  Migliorati, A. Mostacci, L. Pellegrino, M.A. Preger, C. Sanelli, M. Serio, F. Sgamma, B. Spataro, A. Stella, F. Tazzioli, C. Vaccarezza, M. Vescovi, C. Vicario
    INFN/LNF, Frascati (Roma)
  • F. Alessandria, A. Bacci
    INFN/LASA, Segrate (MI)
  • F. Broggi, S. Cialdi, C. De Martinis, D. Giove, C. Maroli, M. Mauri, V. Petrillo, M. Rome, L. Serafini
    INFN-Milano, Milano
  • L. Catani, E. Chiadroni, A. Cianchi, C. Schaerf
    INFN-Roma II, Roma
  • F. Ciocci, G. Dattoli, A. Doria, F. Flora, G.P. Gallerano, L. Giannessi, E. Giovenale, G. Messina, P.L. Ottaviani, G. Parisi, L. Picardi, M. Quattromini, A. Renieri, C. Ronsivalle
    ENEA C.R. Frascati, Frascati (Roma)
  • P. Emma
    SLAC, Menlo Park, California
  • M. Mattioli
    Universita di Roma I La Sapienza, Roma
  • P. Musumeci
    INFN-Roma, Roma
  • S. Reiche, J.B. Rosenzweig
    UCLA, Los Angeles, California
 
 

The first phase of the SPARX project, now funded by MIUR (Research Department of Italian Government), is an R&D activity focused on developing techniques and critical components for future X-ray FEL facilities. This project is the natural extension of the activities under development within the ongoing SPARC collaboration. The aim is the generation of electron beams characterized by an ultra-high peak brightness with a linear accelerator based on the upgrade of the existing Frascati 800 MeV LINAC and to drive a single pass FEL experiment in the range of 3-5 nm, both in SASE and SEEDED FEL configurations, exploiting the use of superconducting and exotic undulator sections. In this paper we discuss the present status of the collaboration.