Klemz, G.
Paper | Title | Page |
---|---|---|
MOPP034 | Upgrades of the Laser Beam-line at PITZ | 110 |
|
||
Funding: This work has partly been supported by the European Community, contract numbers RII3-CT-2004-506008 and 011935, an by the "Impunls-und Vernetzungsfonds" of the Helmholtz Association, contract number VH-FZ-05 In spring of 2005 an essential upgrade of the photocathode laser and of the 27 m long laser beam-line took place at PITZ. A detectable improvement of the laser beam profile at the photocathode is expected. This improvement should lead to an additional reduction of the transverse emittance of the electron beam. The upgraded laser consists of a fully laser diode pumped scheme of pulse train oscillator, pre-amplifiers and booster amplifiers. The main advantages of this upgrade are improved stability, easier maintenance and long-term operations at 10 Hz repetition rate. In addition, the scheme of the optical beam-line was changed: The distance between the beam shaping aperture and the cathode was strongly reduced. Therefore a further improvement of the laser beam profile at the photocathode is expected. The laser beam-line is upgraded by an enlarged number of remotely controlled optical elements that allows the fine tuning of the laser beam characteristics during the running. New diagnostics tools are included in the laser beam-line. The paper focuses on the design of the new optical beam-line. It describes the results of electron beam measurements using the upgraded laser and the new PITZ2 electron beam-line in detail. |
||
THPP043 | Status and First Results from the Upgraded PITZ Facility | 564 |
|
||
Funding: This work has been partly supported by the European Community, contract numbers RII3-CT-2004-506008 and 011935, and by the 'Impuls- und Vernetzungsfonds" of the Helmholtz Association, contract number VH-FZ-05. Since December 2004, the photo injector test facility at DESY in Zeuthen (PITZ) has been upgraded. A normal conducting copper booster cavity has been installed and the diagnostics beamline has been strongly modified. An extended water cooling system has been installed and was successfully taken into operation. Actually, the new diagnostics elements are being commissioned. After the installation of the new 10 MW klystron in June/July, the gun can be conditioned towards higher average power, and the whole beamline including the booster will be taken into operation. First results from the commissioning phase including gun and booster conditioning are reported. |
||