Author Index: A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z

Gensch, U.

Paper Title Page
THPP043 Status and First Results from the Upgraded PITZ Facility 564
 
  • A. Oppelt, K. Abrahamyan, G. Asova, J.W. Baehr, G. Dimitrov, U. Gensch, H.-J. Grabosch, J.H. Han, S. Khodyachykh, G. Klemz, M. Krasilnikov, S. Liu, V. Miltchev, B. Petrosyan, S. Riemann, L. Staykov, F. Stephan
    DESY Zeuthen, Zeuthen
  • W. Ackermann, W.F.O. Muller, S. Schnepp, T. Weiland
    TEMF, Darmstadt
  • D. Alesini, M. Boscolo, G. Di Pirro, M. Ferrario, D. Filippetto, L. Palumbo, C. Vicario
    INFN/LNF, Frascati (Roma)
  • V. Boccone
    Humboldt Universität zu Berlin, Berlin
  • L. Catani, E. Chiadroni, A. Cianchi
    INFN-Roma II, Roma
  • K. Floettmann, S. Schreiber
    DESY, Hamburg
  • T. Garvey
    LAL, Orsay
  • M.V. Hartrott, E. Jaeschke, D. Kraemer, D. Lipka, F. Marhauser, R. Richter
    BESSY GmbH, Berlin
  • P. Michelato, L. Monaco, C. Pagani, D. Sertore
    INFN/LASA, Segrate (MI)
  • V.V. Paramonov
    RAS/INR, Moscow
  • N. Pavel
    Humboldt University Berlin, Institut für Physik, Berlin
  • J.R. Roensch, J. Rossbach
    Uni HH, Hamburg
  • W. Sandner, I. Will
    MBI, Berlin
  • I. Tsakov
    INRNE, Sofia
 
 

Funding: This work has been partly supported by the European Community, contract numbers RII3-CT-2004-506008 and 011935, and by the 'Impuls- und Vernetzungsfonds" of the Helmholtz Association, contract number VH-FZ-05.

Since December 2004, the photo injector test facility at DESY in Zeuthen (PITZ) has been upgraded. A normal conducting copper booster cavity has been installed and the diagnostics beamline has been strongly modified. An extended water cooling system has been installed and was successfully taken into operation. Actually, the new diagnostics elements are being commissioned. After the installation of the new 10 MW klystron in June/July, the gun can be conditioned towards higher average power, and the whole beamline including the booster will be taken into operation. First results from the commissioning phase including gun and booster conditioning are reported.