Paper | Title | Page |
---|---|---|
THYAT0101 | Positron and Damping Ring Requirements for Future e+e− Colliders | 247 |
|
||
Funding: Work supported by the U.S. Department of Energy under contract DE-AC02-76SF00515. Future e+e− colliders will need positron sources that stretch present technical capabilities. The project teams for these proposed colliders are working to extend these capabilities. A positron source encompasses many elements: an electron driver, production target, lattice optics, capture section, damping ring(s), injection/extraction short-pulse kickers, an emittance preserving complex delivery system, specific injection specifications, and (perhaps) polarization. The required technical parameters need to accommodate many beam aspects including bunch intensities, final emittances, spacings, train lengths, and desired damping times. For this note, the technical requirements for positrons related to bunch charges, number of bunches, damping ring lengths and damping times for the various positron sources for the presently proposed colliders are compared, concentrating on their damping ring specifications. |
||
![]() |
Slides THYAT0101 [20.790 MB] | |
DOI • | reference for this paper ※ doi:10.18429/JACoW-eeFACT2022-THYAT0101 | |
About • | Received ※ 01 December 2022 — Revised ※ 03 February 2023 — Accepted ※ 08 February 2023 — Issue date ※ 12 February 2023 | |
Cite • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
FRXAS0101 | Power Budgets and Performance Considerations for Future Higgs Factories | 256 |
|
||
Funding: Work supported by the European Union’s H2020 Framework Programme under grant agreement no. 951754 (FCCIS), and by Fermi Research Alliance, LLC, under contract No. De-AC02-07CH11359 with the US DoE. A special session at eeFACT’22 reviewed the electrical power budgets and luminosity risks for eight proposed future Higgs and electroweak factories (CCC, CEPC, CERC, CLIC, FCC-ee, HELEN, ILC, and RELIC) and, in comparison, for a lepton-hadron collider (EIC) presently under construction. We report highlights of presentations and discussions. |
||
![]() |
Slides FRXAS0101 [1.291 MB] | |
DOI • | reference for this paper ※ doi:10.18429/JACoW-eeFACT2022-FRXAS0101 | |
About • | Received ※ 16 January 2023 — Revised ※ 04 February 2023 — Accepted ※ 08 February 2023 — Issue date ※ 10 February 2023 | |
Cite • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |