Paper | Title | Page |
---|---|---|
WEXAS0101 | Cavity and Cryomodule Developements for EIC | 125 |
|
||
Funding: Work supported by Brookhaven Science Associates, LLC under DOE Contract No. DE-SC0012704, and by Jefferson Science Associates under contract DE-SC0002769 The EIC is a major new project under construction at BNL in partnership with JLab. It relies upon a number of new SRF cavities at 197 MHz, 394 MHz, 591 MHz and 1773 MHz to pre-bunch, accelerate, cool and crab the stored beams. R&D is focusing on the 591 MHz elliptical cavity and 197 MHz crab cavity first as these are the most challenging. Preliminary designs of these cavities are presented along with an R&D status report. To avoid developing multiple different cryostats a modular approach is adopted using a high degree of commonality of parts and systems. This approach may be easily adapted to other frequencies and applications. |
||
![]() |
Slides WEXAS0101 [23.116 MB] | |
DOI • | reference for this paper ※ doi:10.18429/JACoW-eeFACT2022-WEXAS0101 | |
About • | Received ※ 01 December 2022 — Revised ※ 03 February 2023 — Accepted ※ 08 February 2023 — Issue date ※ 20 February 2023 | |
Cite • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
FRXAS0101 | Power Budgets and Performance Considerations for Future Higgs Factories | 256 |
|
||
Funding: Work supported by the European Union’s H2020 Framework Programme under grant agreement no. 951754 (FCCIS), and by Fermi Research Alliance, LLC, under contract No. De-AC02-07CH11359 with the US DoE. A special session at eeFACT’22 reviewed the electrical power budgets and luminosity risks for eight proposed future Higgs and electroweak factories (CCC, CEPC, CERC, CLIC, FCC-ee, HELEN, ILC, and RELIC) and, in comparison, for a lepton-hadron collider (EIC) presently under construction. We report highlights of presentations and discussions. |
||
![]() |
Slides FRXAS0101 [1.291 MB] | |
DOI • | reference for this paper ※ doi:10.18429/JACoW-eeFACT2022-FRXAS0101 | |
About • | Received ※ 16 January 2023 — Revised ※ 04 February 2023 — Accepted ※ 08 February 2023 — Issue date ※ 10 February 2023 | |
Cite • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |