Author: Wang, X.
Paper Title Page
WEOBB04
Operation of Superconducting Final Focus Magnet System of SuperKEKB  
 
  • N. Ohuchi, K.A. Aoki, Y. Arimoto, M.K. Kawai, Y. Kondo, K. Tsuchiya, R. Ueki, X. Wang, H. Yamaoka, Z.G. Zong
    KEK, Ibaraki, Japan
 
  SuperKEKB has been constructed with the target luminosity of 8×1035, which is 40 times higher than KEKB, by the "Nano-Beam" scheme. The beams of 7 GeV electrons and 4 GeV positrons collide at the interaction point (IP) with the crossing angle of 83 mrad, and both beams are squeezed to 50 nano-m in the vertical direction and 10 micro-m in the horizontal direction at IP by the superconducting magnet system. The system consists of 8 superconducting quadrupole magnets (quadrupole doublets), 4 superconducting solenoids and 43 superconducting corrector magnets. After the installation of the magnet system into the beam interaction region, SuperKEKB was operated as the Phase-2 beam commissioning from 2018 March to 2018 July. In the paper, we would like to describe the superconducting magnet system and the experiences on the magnet system during the beam operation.  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPBB01 Operation of SuperKEKB in Phase 2 286
 
  • Y. Funakoshi, Y. Arimoto, H. Ikeda, T. Ishibashi, N. Ohuchi, S. Terui, X. Wang
    KEK, Ibaraki, Japan
 
  The Phase 2 commissioning of SuperKEKB was performed from March to July 2018. In this report, the operation statistics and the QCS quench issue which we encountered during Phase 2 are described.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-eeFACT2018-WEPBB01  
About • paper received ※ 20 October 2018       paper accepted ※ 19 February 2019       issue date ※ 21 April 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)