Author: Morita, A.
Paper Title Page
TUOAB04 Optics Corrections including IP Local Coupling at SuperKEKB 63
 
  • A. Morita, H. Koiso, K. Ohmi, Y. Ohnishi, H. Sugimoto, D. Zhou
    KEK, Ibaraki, Japan
 
  The phase-2 commissioning of the SuperKEKB accelerator with the interaction point(IP) has been performed from March 19 to July 17. In the collision operation during this commissioning, the vertical beta function at the IP was squeezed down to 3mm. In order to achieve such low beta collision operation, many optics corrections were performed. We present the result of those optics measurement and correction.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-eeFACT2018-TUOAB04  
About • paper received ※ 12 October 2018       paper accepted ※ 19 February 2019       issue date ※ 21 April 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUOBB01 Optics Aberration at IP and Beam-beam Effects 66
 
  • K. Ohmi, Y. Funakoshi, H. Koiso, A. Morita, Y. Ohnishi, D. Zhou
    KEK, Ibaraki, Japan
  • K. Hirosawa
    Sokendai, Ibaraki, Japan
 
  Collision in SuperKEKB phase II commissioning has started in April 2018. Luminosity was lower than the geomterical value even in very low bunch current. Linear x-y coupling at IP caused by skew of QCS was conjectured as error source. x-y coupling correction using skew corrector of QCS resulted in luminosity recover of 2 times. After the QCS skew correction, luminosity is still limited at relatively low bunch current. Nonlinear x-y coupling at IP is conjectured as a source of the luminosity limitation. We discuss effects of linear and nonlinear x-y coupling at IP on the beam-beam performance.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-eeFACT2018-TUOBB01  
About • paper received ※ 25 September 2018       paper accepted ※ 19 February 2019       issue date ※ 21 April 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUOBB02 Off-momentum Optics at SuperKEKB 71
 
  • Y. Ohnishi, H. Koiso, A. Morita, K. Ohmi, H. Sugimoto
    KEK, Ibaraki, Japan
  • K. Oide
    CERN, Meyrin, Switzerland
 
  The nano-beam scheme can squeeze the vertical beta function at the IP much smaller than the bunch length. It implies that the large chromaticity is generated in the vicinity of the final focus quadrupole magnets and the strong sextupoles are adopted to correct the chromaticity, for instance the local chromaticity corrections. While understanding of the off-momentum optics is important to optimize the dynamic aperture to make Touschek lifetime long and to reduce the luminosity degradation due to chromatic behaviors. In general, there is a discrepancy between measurements and those obtained from the optics model. The chromatic phase-advance is introduced to measure the off-momentum optics and correct by using sextupole magnets.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-eeFACT2018-TUOBB02  
About • paper received ※ 12 October 2018       paper accepted ※ 19 February 2019       issue date ※ 21 April 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)