Paper |
Title |
Page |
TUPAB02 |
Low Emittance Beam Transport for e−/e+ LINAC |
126 |
|
- Y. Seimiya, N. Iida, M. Kikuchi, T. Mori
KEK, Ibaraki, Japan
|
|
|
Design luminosity of SuperKEKB is 8 x 1035 cm-2s-1, which is 40 times higher than that of KEKB achieved. To achieve the design luminosity, the beam have to be transported to the SuperKEKB main ring with the high bunch charge (4 nC) and low emittance: 40/20 um for horizontal/vertical electron beam emittance and 100/15 um for positron beam emittance in Phase 3 final. In the LINAC and the beam transport line, the emittance growth is mainly induced by residual dispersion, beam phase space jitter, wakefield in acceleration structure, and radiation excitation. In the Phase 2 operation, we have evaluated and, if possible, corrected these effects on the emittance. Results of the emittance measurement is described.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-eeFACT2018-TUPAB02
|
|
About • |
paper received ※ 19 October 2018 paper accepted ※ 19 February 2019 issue date ※ 21 April 2019 |
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
TUPAB07 |
Commissioning of Positron Damping Ring and the Beam Transport for SuperKEKB |
152 |
|
- N. Iida, Y. Funakoshi, H. Ikeda, T. Ishibashi, H. Kaji, T. Kamitani, M. Kikuchi, T. Kobayashi, H. Koiso, F. Miyahara, T. Mori, Y. Ohnishi, Y. Seimiya, H. Sugimoto, H. Sugimura, R. Ueki, Y. Yano, D. Zhou
KEK, Ibaraki, Japan
|
|
|
The Positron Damping Ring (DR) for SuperKEKB successfully started its operation in February 2018, and the commissioning was continued until the end of SuperKEKB Phase 2 in July without serious troubles. This paper describes achievements of the beam commissioning of injection and extraction lines (LTR and RTL) between the LINAC and DR. In the LTR commissioning, the positron beam with high emittance, wide energy spread, and high charge were transported and injected into the DR. In the RTL commissioning, special cares were necessary to preserve the low emittance. The observed emittance growth in the RTL was not a problem for Phase 2, but it should be resolved in the coming Phase 3. In this paper, brief results of the commissioning of the DR is also reported.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-eeFACT2018-TUPAB07
|
|
About • |
paper received ※ 20 October 2018 paper accepted ※ 19 February 2019 issue date ※ 21 April 2019 |
|