WEXBA04 | Early Commissioning of the Luminosity Dither System for SuperKEKB | 212 |
|
||
SuperKEKB is an electron-positron double ring collider at KEK which aims at a peak luminosity of 8 x 1035 cm-2s-1 by using what is known as the ’nano-beam’ scheme. A luminosity dither system is employed for collision orbit feedback in the horizontal plane. This paper reports a system layout of the dither system and algorithm tests during the SuperKEKB Phase 2 commissioning. | ||