Operation of Superconducting Final Focus Magnet System of SuperKEKB | |
|
||
SuperKEKB has been constructed with the target luminosity of 8×1035, which is 40 times higher than KEKB, by the "Nano-Beam" scheme. The beams of 7 GeV electrons and 4 GeV positrons collide at the interaction point (IP) with the crossing angle of 83 mrad, and both beams are squeezed to 50 nano-m in the vertical direction and 10 micro-m in the horizontal direction at IP by the superconducting magnet system. The system consists of 8 superconducting quadrupole magnets (quadrupole doublets), 4 superconducting solenoids and 43 superconducting corrector magnets. After the installation of the magnet system into the beam interaction region, SuperKEKB was operated as the Phase-2 beam commissioning from 2018 March to 2018 July. In the paper, we would like to describe the superconducting magnet system and the experiences on the magnet system during the beam operation. | ||
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
WEPBB01 | Operation of SuperKEKB in Phase 2 | 286 |
|
||
The Phase 2 commissioning of SuperKEKB was performed from March to July 2018. In this report, the operation statistics and the QCS quench issue which we encountered during Phase 2 are described. | ||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-eeFACT2018-WEPBB01 | |
About • | paper received ※ 20 October 2018 paper accepted ※ 19 February 2019 issue date ※ 21 April 2019 | |