KEK
Ibaraki, Japan
DOI Title
10.18429/JACoW-eeFACT2016-MOOTH1 Overview of High Energy e⁺e⁻ Factories
10.18429/JACoW-eeFACT2016-MOOTH2 Commissioning of SuperKEKB
10.18429/JACoW-eeFACT2016-TUT1AH1 Issues on IR Design at SuperKEKB
10.18429/JACoW-eeFACT2016-TUT1BH2 Study of Coherent Head-tail Instablility Due to Beam-beam Interaction in Cirular Colliders Based on Crab Waist Scheme
10.18429/JACoW-eeFACT2016-TUT2H2 Injector Linac Upgrade and New RF Gun Development for SuperKEKB
10.18429/JACoW-eeFACT2016-TUT2H5 Towards a Preliminary FCC-ee Injector Design
10.18429/JACoW-eeFACT2016-TUT3AH2 Instability Issues in CEPC
10.18429/JACoW-eeFACT2016-TUT3AH5 Electron Cloud and Ion Effects and Their Mitigation in FCC-ee
10.18429/JACoW-eeFACT2016-TUT3AH6 Electron Cloud at SuperKEKB
10.18429/JACoW-eeFACT2016-TUT3BH2 Optics Correction and Low Emittance Tuning at the Phase 1 commissioning of SuperKEKB
10.18429/JACoW-eeFACT2016-TUT3BH3 Luminosity Tuning at KEKB
10.18429/JACoW-eeFACT2016-TUT3BH4 Coupling and Dispersion Correction for the Tolerance Study in FCC-ee
10.18429/JACoW-eeFACT2016-WET1H3 Beam Instrumentation in SuperKEKB
10.18429/JACoW-eeFACT2016-WET2H7 LLRF Controls Including Gap Transients at KEKB and Plans for SuperKEKB
10.18429/JACoW-eeFACT2016-WET3AH3 Extraction Line and Beam Dump for the Future Electron Positron Circular Collider
10.18429/JACoW-eeFACT2016-WET3BH1 Improvement of Efficiency of Klystron to Apply the CPD Method
10.18429/JACoW-eeFACT2016-THS1H2 Summary of Optics Issues
10.18429/JACoW-eeFACT2016-THS1H4 Summary of IR and MDI Session
10.18429/JACoW-eeFACT2016-THS2H3 Summary of Beam Instrumentation and Beam Diagnostics Session