Title |
Other Keywords |
Page |
The Status of the ESRF |
booster, insertion, synchrotron, vacuum |
35 |
- A. Ropert (ESRF Grenoble)
|
|
Commissioning and First Operation Experience of the New Heavy Ion Injector of the UNILAC |
accelerator, emittance, field, ion |
167 |
- N. Angert, J. Bossler, L. Dahl, J. Glatz, W. Gutowski, G. Hutter, J. Klabunde, G. Kube, A. Nicklas, U. Ratzinger, D. Schäfer, H. Schulte, R. Schwedhelm, P. Spädtke, W. Vinzenz, M. Wolf (GSI Darmstadt), H. Deitinghoff, J. Friedrich, H. Klein, A. Schempp (Institut für Angewandte Physik)
|
|
Commissioning of the Synchrotron Light Source at LSU |
electron, injection, light source, synchrotron |
197 |
- R.P. Johnson, R.C. Sah, D.Y. Wang (Maxwell Labs), H. P. Bluem, B. C. Craft (Louisiana State University)
|
|
Controlling the ESRF Accelerators |
controls, linac, software, timing |
321 |
- W. D. Klotz (ESRF Grenoble)
|
|
First Beam Results of the ESRF Preinjector |
accelerator, electron, gun, spectrum |
510 |
- P. Berkvens (ESRF Grenoble), B. Grémont, P. Letellier, S. Sierra (General Electric CGR MeV, Buc, France)
|
|
An Interactive Graphical Model for the Design and Control of a Transfer Line |
acceptance, lattice, linac, simulation |
735 |
- M. Plesko (Sincrotrone Trieste)
|
|
A Beam Diagnostic System for Accelerator using Neural Networks |
accelerator, alignment, electron, field |
1155 |
- Y. Kijima, M. Mizota, K. Yoshida (Mitsubishi Electric Company, Tokyo), K. Suzuki (Mitsubishi Electric Corporation and CSK Corporation, Japan)
|
|
Commissioning and Operation of One Booster and Two Storage Ring RF Acceleration Units at the ESRF |
booster, cw, injection, klystron |
1182 |
- J. Jacob, P. Barbier, D. Boilot, C. David, G. Gautier, J. -L. Revol, J. -M. Rigal, D. Vial (ESRF), H. Hoberg, H. K. Knobbe, H. Nöldge (Herfurth GmBH), U. Behrens (SCS CAP Gemini GmbH)
|
|
Operating of the Magnet Power Converters for the Cooler Synchrotron COSY-Jülich |
acceptance, chopper, quadrupole, synchrotron |
1432 |
- H. Borsch, I. Jannakos, K. Kruck, M. Sauer, W. Schalt, J. Schmitz, H. Schneider, U. Schwarz, E. Veiders (Forschungszentrum Jülich GmbH)
|
|
Operational Experience with the LEP Low-Beta Superconducting Quadrupoles |
controls, monitoring, quench, vacuum |
1641 |
- Ph. Lebrun, O. Pagano, T. M. Taylor, L. Walckiers (CERN)
|
|