| Paper | Title | Page |
|---|---|---|
| THPKF025 | Commissioning Report of the CLS Booster Synchrotron | 2317 |
|
||
| A full energy booster is produced and taken into operation for the Canadian Light Source. The Booster accelerates the beam from the injection energy of 200 MeV to a maximum of 2.9GeV. The results of the commissioning and the characterized beam parameters are reported |