Commissioning of RHIC at 100 GeV/Nucleon       380
  D. Trbojevic, L. Ahrens, M. Bai, J. Beebe-Wang, M. Blaskiewicz, J.M. Brennan, P. Cameron, J. Cardona, R. Connolly, J. De Long, A. Drees, W. Fischer, R. Fliller III, G. Ganetis, W. Glenn, H. Hahn, T. Hayes, J. Kewisch, W.W. MacKay, A. Marusic, C. Montag, S. Peggs, F. Pilat, V. Ptitsyn, T. Roser, T. Satogata, C. Schultheiss, K. Smith, S. Tepikian, N. Tsoupas, J. van Zeijts, BNL, Upton, Long Island, New York      
  PAPER        
       
  PLL Tune Measurement during RHIC 2001       1855
  P. Cameron, P. Cerniglia, J. Cupolo, W. Dawson, C. Degen, A. DellaPenna, A. Huhn, M. Kesselman, A. Marusic, J. Mead, C. Schultheiss, R. Sikora, J. Van Zeijts, BNL, Upton, Long Island, New York      
  PAPER        
       
  Measuring Chromaticity along the Ramp using the PLL Tune-meter in RHIC       1983
  S. Tepikian, L. Ahrens, P. Cameron, C. Schultheiss, BNL, Upton, Long Island, New York      
  PAPER        
       
  Real-Time Betatron Tune Control in RHIC       2094
  C. Schultheiss, P. Cameron, A. Marusic, J. van Zeijts, BNL, Upton, Long Island, New York      
  PAPER        
       
  A State-Variable Description of the RHIC RF Control Loops       2097
  C. Schultheiss, J.M. Brennan, BNL, Upton, Long Island, New York      
  PAPER